Design of Demolishing Scheme for a 3-Span Continuous Box Girder Bridge
Article 2011 EN
For the demolishing construction of a 3-span continuous box girder bridge with span arrangement(18+26.4+18) m,a demolishing scheme was proposed and designed,i.e.,the main girder of the bridge was stabilized by the bailey truss and suspenders,the girder was cut into 3 sections by the diamond steel wire cutting method,the section of the girder over the central span was lifted away by the overhead la…
0
Citations
0
References
1
Authors
0.00
FWCI
Topics
Keywords
UN Sustainable Development Goals
1 SDGsAuthors & Affiliations
1 authors| # | Author | Institutions | ORCID |
|---|---|---|---|
| 1 | Hua Long-hai Corresponding | Tianjin Municipal Engineering … (CN) | — |
Related Works
20Data: OpenAlex